You are atop Flood Control Dam #3, which was once quite a tourist attraction. There are exits to the northeast and west, and a scramble down. The sluice gates on the dam are closed. Behind the dam is a wide reservoir. Water is pouring over the top of the abandoned dam. There is a control panel here, on which a large metal bolt is mounted. Above the bolt is a small green plastic bubble.
A guidebook entitled “Flood Control Dam #3” is on the ground.
There is a matchbook whose cover says “Visit beautiful FCD#3” here.
> take the matches
Taken.
> read the guidebook
[Taken]
“Flood Control Dam #3 was constructed in 783 GUE with a grant of 37 million zorkmids from Lord Dimwit Flathead the Excessive. This impressive structure is composed of 370,000 cubic feet of concrete, is 256 feet tall and 193 feet wide.
The construction of FCD#3 took 112 days from ground breaking to dedication. It required a work force of 384 slaves, 34 slave drivers, and 12 engineers, 2345 bureaucrats, and nearly one million dead trees.
As you start your tour, notice the more interesting features of FCD#3. On your right…
> drop the guidebook
Dropped.
> go northeast
Continue reading →